feedbackspaces

This is a live example — an earlier week of the same student's journey.

Back to the latest session

Tutorial record · Design Studio 2

Tutorial — massing studies

Sam (example student) · Thu 28 May, 15:00

What we agreed

  • Try a ramp connecting the two blocks, so the scheme reads as one building.

  • Check the ramp against a 1:12 gradient before the next review.

What happened

An early look at the gallery massing: two orthogonal blocks with a stair core, and a gap between them that neither plan resolves. The scheme reads as two separate buildings. The way forward discussed was a connecting move — possibly a ramp — and testing whether one organising idea could hold the pieces together.

Pages from the session

Page 1
p.1

There is no recording for this tutorial.

This page is private to you and your tutor

The work over time

28 May4 Jun

Threads through the term

  • Develop the ramp as the organising move — a two- to three-storey space with light slipping down alongside it.

    28 May4 Jun· raised 2 times — still open

  • Check the ramp against a 1:12 gradient before the next review.

    28 May4 Jun· resolved