Tutorial record · Design Studio 2
Tutorial — massing studies
Sam (example student) · Thu 28 May, 15:00
What we agreed
Try a ramp connecting the two blocks, so the scheme reads as one building.
Check the ramp against a 1:12 gradient before the next review.
What happened
An early look at the gallery massing: two orthogonal blocks with a stair core, and a gap between them that neither plan resolves. The scheme reads as two separate buildings. The way forward discussed was a connecting move — possibly a ramp — and testing whether one organising idea could hold the pieces together.
Pages from the session

There is no recording for this tutorial.
This page is private to you and your tutor

